High Speed Train Project

TCDD Ankara – Istanbul High Speed Train Project Köseköy – Gebze Section RC Technical Rooms CNS (7 Each), Istanbul / TURKEY
 
 
Commenced:  April 30, 2014
 
Project Budget: $1,683,923.00 / 3,115,259.00 YTL
 
Civil-Structural-Architectural Works
  • Construction of (7) ea reinforced concrete technical buildings for high speed train stations including MV and LV service power feeders, mechanical works, interior architectural works  and exterior & interior electrical works.
  • Total Construction Area: 3098 m2
  • Excavation: 1890 m3 
  • Concrete: 1015 m3
  • Reinforcement: 111 Ton.
  • Formwork: 3780 m2
  • Scaffolding: 4270 m2
  • Insulation: Water and Vapor Insulation at foundation
  • Water and Thermal Insulation at roof
  • Thermal Insulation at exterior
  • Roof: RC Roofing c/w insulation
  • Walls. (7245 m2)
  • Ceilings: Suspended Ceiling, Paint
  • Floor Covers: Vinyl, Ceramic Tiles, Epoxy paint and cover, Marble
  • Interior Walls: 1099 m2
  • Fire Rated Interior Walls: 510 m2
  • Plaster: 3430 m2
  • Raised Floor: 595 m2
  • Interior & Exterior Paint: 3850 m2
  • Fire Rated Doors: 14 Each
  • Metal Doors: 14 Each
  • Windows: Double Glazing Thermo-Break Aluminum 105 m2
 
Electrical Works:
  • Service Power Feeder
  • Interior & Exterior Lighting
  • Emergency Lighting
  • Fire Alarm Systems
  • DATA & Telephone Systems
  • Back-up Power Systems
 
Mechanical & Plumbing Works:
  • Mechanical: A/C Units (14 Each)
  • Domestic Water and Sanitary Systems
  • Domestic Water and Sewer Lines connection to existing municipal infrastructure