TCDD Ankara – Istanbul High Speed Train Project Köseköy – Gebze Section RC Technical Rooms CNS (7 Each), Istanbul / TURKEY
Commenced: April 30, 2014
Project Budget: $1,683,923.00 / 3,115,259.00 YTL
Civil-Structural-Architectural Works
-
Construction of (7) ea reinforced concrete technical buildings for high speed train stations including MV and LV service power feeders, mechanical works, interior architectural works and exterior & interior electrical works.
-
Total Construction Area: 3098 m2
-
Excavation: 1890 m3
-
Concrete: 1015 m3
-
Reinforcement: 111 Ton.
-
Formwork: 3780 m2
-
Scaffolding: 4270 m2
-
Insulation: Water and Vapor Insulation at foundation
-
Water and Thermal Insulation at roof
-
Thermal Insulation at exterior
-
Roof: RC Roofing c/w insulation
-
Walls. (7245 m2)
-
Ceilings: Suspended Ceiling, Paint
-
Floor Covers: Vinyl, Ceramic Tiles, Epoxy paint and cover, Marble
-
Interior Walls: 1099 m2
-
Fire Rated Interior Walls: 510 m2
-
Plaster: 3430 m2
-
Raised Floor: 595 m2
-
Interior & Exterior Paint: 3850 m2
-
Fire Rated Doors: 14 Each
-
Metal Doors: 14 Each
-
Windows: Double Glazing Thermo-Break Aluminum 105 m2
Electrical Works:
-
Service Power Feeder
-
Interior & Exterior Lighting
-
Emergency Lighting
-
Fire Alarm Systems
-
DATA & Telephone Systems
-
Back-up Power Systems
Mechanical & Plumbing Works:
-
Mechanical: A/C Units (14 Each)
-
Domestic Water and Sanitary Systems
-
Domestic Water and Sewer Lines connection to existing municipal infrastructure